Skip to main content

Schedule Change Impact for Lost & Added Connections

This guide walks you through executing and interpreting a Schedule Connectivity Comparison between two schedule baselines (or SSIM versions) for a target carrier and hub.

MaestrowPROMPT
Please run a schedule connectivity comparison between [Latest Schedule / Date / SSIM Version] and [Previous Schedule / Date / SSIM Version] for [Carrier Code, e.g., KM]. Analysis Requirements: - Scope / Hub: Evaluate connections via hub [e.g., MLA] across all relevant Origin & Destination (O&D) city pairs (or specify: e.g., MLA–LHR, MLA–MUC, etc.). - Connection Rules: Apply standard MCT and maximum connect time window (e.g., 45 to 300 minutes, online and partner/interline connections). - Output Details: 1. Group results by Market (O&D). 2. Identify Gained Connections (new valid connecting pairs in the latest schedule). 3. Identify Missed / Lost Connections (pairs that were valid previously but no longer meet MCT or were de-scheduled/retimed). 4. Summarize net change in weekly frequencies and average elapsed time per market.

1. Parameter Reference​

ParameterRequiredExample ValuesDescription
Carrier CodeYesKM, BA, LHThe 2-letter IATA (or 3-letter ICAO) code of the validating/marketing carrier.
Latest ScheduleYes2025-06-01, SSIM_W24_v3The target/new schedule release or SSIM version to evaluate.
Previous ScheduleYes2025-05-01, SSIM_W24_v2The baseline schedule used for variance comparison.
Hub / GatewayYesMLA, FRA, LHRHub station code where inbound and outbound legs connect.
Scope / O&D PairsOptionalALL, MLA-LHR, FCO-MLA-LGWSpecific city pairs or all network pairs routed via the hub.
MCT (Minimum)OptionalDefault or 45 minMinimum connection time enforced at the hub (station default or custom).
Max Connect TimeOptional300 min (5 hours), 360 minUpper bound for acceptable connection elapsed time.
Connection TypesOptionalOnline only, Online + InterlineInclude only own-metal flights or partner/codeshare combinations.

2. Analysis Methodology & Workflow​

flowchart LR
A[Baseline Schedule] --> C[Connection Builder Engine]
B[Latest Schedule] --> C
C --> D{MCT & Max Window Filter}
D --> E[Identify Gained Pairs]
D --> F[Identify Lost / Missed Pairs]
D --> G[Calculate Frequency & Elapsed Time Variance]
E --> H[Consolidated O&D Summary Report]
F --> H
G --> H

Key Metrics Defined​

  • Gained Connections: City-pair combinations that are valid under the latest schedule but did not exist or meet connection criteria in the baseline.
  • Missed / Lost Connections: Pairs that were valid in the baseline schedule but are broken in the latest schedule due to:
    • Flight cancellation / de-scheduling.
    • Retimed arrival/departure violating Hub MCT.
    • Retimed flight exceeding the Maximum Connect Time window.
  • Net Frequency Variance (Δ Freq): Difference in weekly connecting frequencies per directional O&D.
  • Average Elapsed Time (Δ Elapsed): Change in total journey time (Inbound Block Time + Layover + Outbound Block Time).

3. Expected Output Schema​

When the comparison is complete, results are provided in the following structured layout:

A. Network Executive Summary​

  • Hub: MLA
  • Analyzed Period: SSIM v2 (Baseline) vs SSIM v3 (Current)
  • Total O&D Markets Evaluated: 142
  • Net Weekly Connecting Frequencies: +18 (+4.2%)
  • Total Gained Connection Pairs: 34
  • Total Lost Connection Pairs: 16
  • Average System Elapsed Time Change: -12 mins (improved)

B. Market Breakdown (O&D Level)​

Market (O&D)Baseline Wkly FreqCurrent Wkly FreqNet Change (Δ)Gained PairsLost PairsAvg Elapsed Time (Δ)Primary Driver / Notes
FCO – MLA – VIE710+330-15 minAdded afternoon FCO bank
LHR – MLA – CTA147-707+45 minKM retimed LHR arrival past MCT
MUC – MLA – TIP05+550210 minNew seasonal connecting service

4. Troubleshooting & Common Pitfalls​

caution

Check Time Zones & Date Overlaps Ensure both baseline and comparison datasets cover identical day-of-week matrices or equivalent effective date ranges to avoid false "lost" connection signals caused by seasonal date boundaries.

info

Terminal-Specific MCTs If your hub operates multiple terminals, ensure terminal transfer times are accounted for if standard station-level MCT is not uniform across all gates.

5. Next Steps & Follow-Up Prompts​

Once you receive the connectivity results, you can branch into detailed operational reviews:

Export Data: "Export the full connection variance table to a CSV file for Excel analysis." Visualise Impact: "Generate a bar chart comparing the top 10 gained vs top 10 lost markets by weekly frequency." Schedule Diagnostics: "Show the exact flight arrival and departure times for the lost connections on the LHR–MLA–CTA route."